Jobs in Rest of NE

CCML Imphal Recruitment 2024 - Junior Engineer (Electrical) Vacancy

Sentinel Digital Desk

Cyber Corporation Manipur Limited (CCML), Imphal released the latest job notification for the recruitment of Junior Engineer (Electrical) vacancy. Interested candidates can apply before the last date. Check more details on the Cyber Corporation Manipur Limited (CCML), Imphal job vacancy 2024.

Cyber Corporation Manipur Limited (CCML Imphal Recruitment 2024)

Cyber Corporation Manipur Limited (CCML), Imphal has released an employment notification for the recruitment of Junior Engineer (Electrical) Vacancy. More details about the recruitment are provided below:

Details about CCML Imphal Recruitment 2024

Post Name- Junior Engineer (Electrical)

Posts- 01

Location- Imphal, Manipur

Salary- Rs. 5200-20200/- Per Month

Last Date- 30-04-2024

Age- 21-38 years

Application Fees- N/A

Qualification for Junior Engineer (Electrical) Job Vacancy at CCML Imphal Recruitment 2024

To apply for the post of Junior Engineer (Electrical) at Cyber Corporation Manipur Limited (CCML), Imphal, candidate should have done Diploma in Electrical Engineering.

How to apply for CCML Imphal Recruitment 2024

Eligible and interested candidates can filled in application form along with relevant documents at the office of Managing Director, M/s Cyber Corporation Manipur Limited, 4th Floor, Western Block, New Secretariat, Imphal West-795001.

Disclaimer: Provided by Cyber Corporation Manipur Limited (CCML), Imphal.

About Cyber Corporation Manipur Limited (CCML), Imphal

The Cyber Corporation of Manipur Limited (CCML), an Undertaking of the Government of Manipur in its pursuit of establishing IT/ITES Industry in Manipur, is proposing to set up an IT SEZ on a contiguous land measuring 27-acre adjacent to the Software  Technology Parks of India (STPI) Campus, located at Mantripukhri.

The IT SEZ Project is about development of Land with a built-up area of 13.6 lakh sq. ft. which is equally divided into the Processing Zone and Non-Processing Zone in 50:50 ratio. The project is expected to cost approximately INR 950 Cr. and is to be delivered in 3 phases over a period of 5 years, starting April 2021.